- Overview
- More Products
- Our Advantages
- Our inventory
- Function
- Exhibition
- Packaging & Shipping
- FAQ
- Certifications
Basic Info.
Product Description
(2) Processing center processing, standard size, stable quality.
(3) Single inspection outbound to ensure 100% qualified product outbound.
(4) Adjust the balance test of the outbound and inbound actions to ensure the stability of the vehicle during loading.
Truck Model | Sinotruk, Shacman, Foton Auman, FAW Jiefang, Dongfeng, Dongfeng Liuqi Balong, North BENZ( BEIBEN), C&C, JAC, etc. | |
Product catalogue | Axle | Wheel Assembly |
Differential Assembly | ||
Main Reducer Assembly | ||
Inner Ring Gear& Bracket | ||
Basin Angle Gear/ Bevel Gear | ||
Axle Shaft/ Half Shaft & Through Shaft | ||
Axle Housing& Axle Assembly | ||
Steering knuckle & Front Axle | ||
Gear | ||
Brake Drum& Wheel Hub | ||
Flange | ||
Bearing | ||
Main Reducer Housing | ||
Oil Seal Seat | ||
Nut& Shim Series | ||
Brake Backing Plate | ||
Chassis Support Products | Leaf Spring Bracket | |
Drop Arm Series | ||
Bracket Series | ||
Leaf Spring Shackle Series | ||
Balanced Suspension Series | Balance Shaft Assembly | |
Balance Shaft Housing | ||
Axle Spring Seat | ||
Thrust Rod | ||
Balance Shaft Parts | ||
Shock Absorber Series | Shock Absorber | |
Shock Absorbing Airbag | ||
Steering System | Power Steering Pump | |
Power Steering Gear | ||
Rubber Products | Oil Seal | |
Rubber Support | ||
Thrust Rod Rubber Core | ||
Truck Belt | ||
Engine support | ||
Other | ||
Clutch Series | Clutch Pressure Plate | |
Clutch Disc | ||
Flywheel Assembly | ||
Flywheel Ring Gear | ||
Adjusting Arm Series |
Shandong Qinyi Auto Parts Manufacturing Co., Ltd. was established in 2011. We are a heavy-duty truck auto parts professional manufacturer, which integrating research and development, production, assembly line and product sales. The products include SINOTRUK, SHACMAN, Foton, North-Benz(BEIBEN), SAIC Hongyan, FAW Jiefang, Dongfeng, Ford Truck, VOLVO, MAN, DAF, BENZ and so on.
Our factory is located in Jinan, Shandong, China. The production workshop covers an area of 3,200 square meters, the assembly workshop covers an area of 2,200 square meters, and the warehouse covers an area of 3,800 square meters. We have a mature production system and product research and development capabilities, rich assembly experience, and advanced testing equipment. Provide you with competitive and high quality products.
The balance shaft can ensure that the rear axle, middle and rear axles can bear a uniform load, with a large bearing capacity and reliable operation. We can think of the balance shaft as a seesaw. The balance shaft bracket is located on a large frame and serves as a support point for the seesaw. The balance shaft housing is installed on the balance shaft bracket through bearings and can rotate around the balance shaft bracket. The steel plate is installed on the balance shaft shell and fixed to the shell through riding bolts.
Steel plates can be seen as a seesaw board. The two ends of the steel plate are connected to one end of the two bridge shells through rubber bearings (elastic connections). There is no rigid fixation between the steel plate and the bridge shell, which allows for slight longitudinal sliding, coupled with longitudinal deformation of the rubber bearing. One end of the bridge shell can be seen as a cute little fart child hanging under a rubber support, up and down.
The function of the balance shaft is to make the tire easily tilt up, with significant movement, without affecting the other three sided tires. In the final analysis, it is able to make the deformation at both ends of the steel plate correspond to each other, thereby better absorbing vibration.
Disconnect type balance shaft, as well as integral type. The integral type is a rubber bearing replaced by a steel plate seat, with hard contact.
Q1. How about price of products?
The price is negotiable.It can be changed according to your quantity or package. When you are making an inquiry, please let us know the quantity you want.
Please provide the exact or approximate quantity, packing details, destination port or special requirements, so we could give you the price accordingly.
Q2. What is the products delivery time?
Generally, it will take 3 to 10 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q3.Do you test all your goods before delivery?
Yes,we have 100% test before delivery.
Q4.What is your terms of payment?
By TT or We'll show you the photos of the products and packages before you pay the balance.
Q5. Do you accept third party inspection?
Yes,we do.
Q6. Are you a factory or trading company?
We are a factory integrating research, development, production and sales.